Crews will replace steel expansion joints on the Duwamish River bridge with epoxy joints, designed to better withstand water and vibration.
Crews will replace steel expansion joints on the Duwamish River bridge with epoxy joints, designed to better withstand water and vibration.
PO Box 418
3701 South Road
Mukilteo, WA 98275